Updated: 23 April 2020
Jira: EPICS Status is mentioned below:
- https://jira.o-ran-sc.org/browse/ODUHIGH-1 - DONE
- As an O-DU L2 developer, I want to create F1AP module based on F1 interface APIs and develop them as per the architecture defined
- https://jira.o-ran-sc.org/browse/ODUHIGH-8- WIP
- As an O-DU L2 developer, I want to implement FAPI interface towards O-DU low
- https://jira.o-ran-sc.org/browse/ODUHIGH-9 - WIP
- As an O-DU L2 developer, I want to implement cell broadcast procedure at MAC Layer
- https://jira.o-ran-sc.org/browse/ODUHIGH-10 - WIP
- As an O-DU L2 developer, I want to implement UE attach procedure with basic scheduling
- https://jira.o-ran-sc.org/browse/ODUHIGH-11 - DONE
- As an O-DU L2 developer, I want to implement E2 interface
- https://jira.o-ran-sc.org/browse/ODUHIGH-27 - DONE (partially)
- As an O-DU L2 developer, I want to develop RLC layer interfaces
Risks:
- E2SM Specification baseline is still not available while the development is being done using below draft specifications.
- ORAN WG3.E2AP v01.00
- ORAN WG3.E2SM v01.00
- WLS, FAPI interface files baseline - FAPI interface development is dependent on this.
- UE Attach Scenario development - Completed till msg-2, remaining scope moved to C release as E2 changes were included in the scope.
...