Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Agenda:

2024-01-31:

J Release targets:

ETSI DMS profile enhancement.

https://wiki.o-ran-sc.org/download/attachments/35881444/Tacker%20J-Release_for%20SMO_Jan_rev1.pptx?api=v2

K8s profile Integration to the SMO code - Draft.

View file
nameNF Orchestration Using SMO (Design details).pptx
height150

Recording

View file
namevideo1994022317.mp4
height150

2024-01-10:

I release status.

...

  1. O-RAN SMO enhancements - Aarna Networks (Bhanu and Sandeep)
    View file
    nameSMO_Upstream_Aarna.xlsx
    height250
  2. Problem Statement: While trying to remove the device, the callhome device doesn’t get removed and the mount point that we’re trying to remove is not found.
    Impact: Customer will not be able to remove the call home device from SMO
    Workaround: None. In the worst case scenario, restarting of the call home device or disconnecting the netconf client will work which may not be a viable option for the customer
    RCA: Document Attached
    Community JIRA: https://jira.opendaylight.org/browse/NETCONF-989
    Community Forum: Attached the image (in ONAP CCSDK)

  3. Continuation to the previous discussion on ONAP SO vs SMO
    1. Planning to have a discussion on the Nephio R2 F2F meeting - to talk on how these communities can collaborate in the long run
    2. Operator based, ASD, integration points across these communities and see how can we leverage the functionalities.
    3. Timo, Seshu and Byung to participate and present the ideas around the topic.
    4. ONAP E2E orch, Nephio domain and ORAN for the RAN specific workloads as a starting point.
    5. (Byung) Sana discussed on WG1 Nephio on how the NFVO and other components would interact.


Prev Discussion items - 

2023-09-13

ONAP SO vs SMO sync - Byung and Seshu

Discuss on the ONAP Service orch pieces that could come handy to the SMO.

ASD, Inventory, IMS and DMS, E2E orch flow...

IMS :

once a a sub cloud is created we need that details to be avaialble to the DMS.

ETSi - profile - Tacker

   The Tacker will be through helm deployment will be done on top of the OCloud,

   This Tacker will then help the SMO to deploy the workloads of ETSi specific.

   Tacker talks to the O-Cloud for the DMS operations - this uses the ETSi specifications and translates it internally uses the K8s APIs for the deployment.


K8s Profile - CNF orch piece of the ONAP SO

Inventory - persist the info of the clouds that are created in the Day 1.

This inventory should be the transition for all the sub-sequent operations in the SMO and further down to the other components of the ORAN(-SC).


Demo of using ONAP SO CNFM for LCM of ASD-based functions (NONRTRIC team in May 2023):

  • 2023-05-17  "LCM of ASD-based CNFs using ONAP CNFM function in Standalone mode" Aravindhan Ayyanathan 
  • At RSAC committee Meeting (17 May 2023)
  • Demonstrate ASD-based LCM for CNFs using a cut-down version of the CNFM function originally from the ONAP SO project. The function can be used in standalone mode without the need for the rest of SO, A&AI or SDC.
  • See Video (HD), Video (SD) and Slides for more information
  • Will add link to the ASD archives ...


Actions Items:

Stories under the Epic for the ETSi profile DMS to be created - Toshi.

...

  • The placement of the Tacker code needs to be clarified - Toshiaki.
  • Update the flow diagram for the homing, inventory and deployment of the NFs using tacker - Toshiaki
  • Test case to be used - co-ordinate with Integration team -  CSAR package from the prev package - Toshiaki
    • Step 1 : A simple app that can be considered as a low lying fruit to validate the flow
    • Step 2:
    • Possibilities are VNFM  Radisys OCU / OAI-OCU for the E2E flow testing once they are ready
    • NRT RiC that could be deployed on oCloud.
  • The FM data on O2 is available in Nov 2022, on O2 IMS.
    • @David Kinsey
    • This need to be validated and on the IMS part and DMS needs to be clarification.
    • ORAN-SC-INF has already validated the FM data part in their release package.
    • PM would be available by March 2024
    • @Yuya Kuno : Currently O-RAN WG6 is pending on FM/PM of O2dms, but O2dms of NFV-Profile started to develop FM/PM based on SOL002/SOL003 by Nov train.

2023-08-23 Meeting notes:

DetailsItemWhoNotes




Recording

View file
nameaudio1683193723.m4a
height250
View file
namechat.txt
height250

...