2025-05-06 Meeting notes - Joint OAM / NONRTRIC / SIM Community meeting
Time & Location:
Meeting Detail: Times & Joining Info
Today: Tuesday at 15:00 UTC
https://us02web.zoom.us/j/89069708424?pwd=aGJOZm54eTUxd0FXR0VCU1N0ejBrUT09
- Ensure you are signed into your Zoom account to join.
- Meeting ID: 890 6970 8424. By Phone: Dial in (Local numbers): You will need a Participant ID so you will need to join the meeting from a Zoom client first to get this.
- Calendar: https://lists.o-ran-sc.org/g/main/calendar
- NOTE: During the "Daylight Savings Time" changeover periods (US vs Europe vs Asia) the time of the meetings may fluctuate.
- Summer (northern hemisphere) (Q2 & Q3): 8am PDT | 11am EDT | 15:00 UTC | 16:00 BST | 17:00 CEST | 18:00 EEST | 20:30 IST | 23:00 CST | +1d 00:00 JST (Wed)
- Winter (northern hemisphere) (non-DST) (Q1 & Q4): 8am PST | 11pm EST | 16:00 UTC | 16:00 GMT | 17:00 CET | 18:00 EET | 21:30 IST | +1d 00:00 CST (Wed) | +1d 01:00 JST (Wed)
Please checkout the calendars:
Anti-Trust Notice
Date
Attendees
- Alex Stancu (Highstreet & OSC SIM)
- Martin Skorupski (Highstreet & OSC OAM & RSAC)
- John Keeney (Ericsson EST) (OSC NONRTRIC)
- subhash (Samsung & OSC AIMLFW)
- Sunil N (Samsung)
- Saul Gill (Ericsson EST)
- Aravindhan Ayyanathan (Ericsson EST) (Ericsson EST)
- Sri Venkata Naga Phanindra Akula (tu-chemnitz.de)
- Sridhar Rao (LF)
- ... others. Please add yourself
- May not have captured a full correct attendee list for this meeting ... please add/remove yourself
See also / co-located (ONAP/O-RAN-SC/SMO - Meeting)
Co-located with ONAP 2025-05-06 Meeting notes (ONAP/O-RAN-SC/SMO - Meeting)
Contents
Recording
Notes:
Housekeeping:
- Next Meetings:
- As normal for upcoming weeks: Tuesdays at 15:00 UTC
- 20 May 2025 - Cancelled - Will be traveling to OAI workshop in Kista.
- 27 May 2025 - As usual
- 3 June 2025 - Cancelled - O-RAN F2F - Japan
- 10 June 2025 - Martin Skorupski & John Keeney (Ericsson EST) away - Cancel?
- 17 June 2025 - John Keeney (Ericsson EST) away - Martin Skorupski will host as usual (tbc)
- 24 June 2025 - John Keeney (Ericsson EST) away - Martin Skorupski will host as usual (tbc)
Calendar:
https://lists.onap.org/g/onap-meetings/calendar
- Issue with Calendars this week! - Will fix.
- Will update invites according to Daylight Savings Time changeover. See above.
- Zoom Bridge
- Will change in coming weeks. Will move to RSAC bridge.
- More details soon. Will update all calendar entries & wiki pages etc.
- Will change in coming weeks. Will move to RSAC bridge.
OSC SMO project calls now move to its own time slot - alternate Thursdays
See OSC RSAC Calendar: https://lf-o-ran-sc.atlassian.net/wiki/display/RSAC/calendars
See also OSC Meetings calendar: https://lists.o-ran-sc.org/g/main/calendar
(Note this meeting to open to anyone, including non-ORAN members)
We will maintain this slot for ONAP Alignment, and try flag issues/question to/from SMO meetings.
See also OSC AIML Project meeting notes
OSC Project roundup:
News from OSC TOC & OSFG & RSAC calls last week
TOC:
- https://lf-o-ran-sc.atlassian.net/wiki/display/TOC/#ORANSCTechnicalOversightCommittee(TOC)
- Last week's TOC (Thursday):
- This week's TOC (Thursday):
OSFG: (Martin Skorupski)
- Prep for OSFG workshop in Kista - after the OAI summer workshop
- May 23rd (After OAI summer workshop) in Kista Sweden
- OAI Workshop (Wed & Thurs) : Agenda & Register https://openairinterface.org/summer-2025-workshop-the-openairinterface-path-to-ai-driven-6g/
- OSFG Friday meeting: Agenda, Register etc : https://oranalliance.atlassian.net/wiki/spaces/OAH/pages/3953524737/OSFG+ad-hoc+Meeting
- May 23rd (After OAI summer workshop) in Kista Sweden
- Prep for OSFG workshop in Kista - after the OAI summer workshop
- RSAC (Martin Skorupski )
- Minutes: RSAC Meeting notes
- No update
Proposal: "Predict future PRB demand per slice in 5G RAN Network" (Sunil N)
- Sunil N Working on this now. Will revert via stack if there is any issue.
- Last week:
Sunil N presented some slides proposing a new use case & rApp for "PRB demand prediction - per slice"
Slides: ORAN_Proposal_Predict_Future_PRB_Demand_Per_Slice_In_5G.pptx
All: Looks great. Looking forward to getting stated.
rApp & deployment will be very similar to AIML rApp demos at 2024-10 O-RAN F2F Montreal
See also Energy Saving rApp usecase for another sample.
Will start with dummy data. for training
Will work with subhash for training etc & how to store trained model
Action: John Keeney (Ericsson EST) to propose a new repo to store rApps
larger/ongoing rApps may be promoted to own repo later
(Need to remove existing old/obsolete rApp from many years ago!)
Action: Sunil N Aim to create a wiki page for the use case, to store snippets, discussions etc for future users & other rApps developers
Also discuss on mailing list and/or slack as needed. (Slack invite)
Action: Sunil N & Martin Skorupski To briefly present & then track use case in RSAC.
How to access Winlab servers (Martin Skorupski, Ivan Seskar)
- Plan for 8 servers - will look something like this:
srv1.osc.cosmos-lab.org
→ ?? used by O-RAN-SC INT for Tackersrv2.osc.cosmos-lab.org
→?? Environment1 (K-Release: Stable)srv3.osc.cosmos-lab.org
→ ?? Environment1 (K-Release: Stable)srv4.osc.cosmos-lab.org
→ ?? Environment1 (K-Release: Stable)srv5.osc.cosmos-lab.org
→ ?? EnvironmentA (L-Release: Development)srv6.osc.cosmos-lab.org
→ ?? EnvironmentA (L-Release: Development)srv7.osc.cosmos-lab.org
→ ?? EnvironmentA (L-Release: Development)srv8.osc.cosmos-lab.org
→ ?? Experimental → wiped out very day at 00:00 UTC?Example ssh config file
Host o-ran-sc-gateway HostName gw.orbit-lab.org Host o-ran-sc-srv1 HostName srv1.osc.cosmos-lab.org ProxyJump gw.orbit-lab.org
- Make sure to create profile & upload public key for Orbit:
- Ref Ivan's talk at the last F2F 2025-02 O-RAN F2F Paris & Slides
- https://www.orbit-lab.org/userManagement/register
- Connections will be via a jump-host.
vDTF event next week:
- Link & Registration & Agenda
- Tues/Wed next week
- ONAP DTF DAYs 2025
- https://linuxfoundation.regfox.com/onap-dtf-2025
- See esp. talk on TEIV/NCMP/SDNC integration (John Keeney (Ericsson EST), Jeff van Dam, Byung-Woo Jun)
RSAC & Prep for O_RAN F2F - Japan - 2-6 June
- 2025-06 O-RAN F2F Fukuoka
- Aim for a session on collaborative integration - based on work discussed / demoed at OAI workshop & OSFG workshop
- Aim for a session on collaborative integration - based on work discussed / demoed at OAI workshop & OSFG workshop
How to add PM data to InfluxDB (Demond Wael)
- No update
- Last week:
- Hello to Aya Kamal Elbakly, Demond Wael, Mina Akram, Ziad Hossam (Orange Innovation Egypt) 👋
- Difficult to inject data into RANPM pipeline to have it appear in InfluxDB
- Suggest try latest version of SMO install (inclund RANPM functions from it/dep)
- Need to build https-server & ranpm-raap locally - they are not "released"
- Need to ensure data ingested is in 3GPP PM file format & PM Producer filter is configured to match data.
- Check logs
- Working on a CSV → 3GPP file format - overlaps with work in Energy Saving rApp usecase to convert Viavi-format CSV → 3GPP XML file format
- From last week & again this week:
- John Keeney (Ericsson EST) Avoid trying to use internal interfaces/formats/topics in the RANPM flow
- Use 3GPP XML files, hosted in some FTP/HTTP server (HTTP server provided), then send a VES event to VES collector (with the path/filename to the new file)
- Toolchain does all necessary XML→JSON translation, filtering etc, then inject into InfluxDB)
- Ref: https://docs.o-ran-sc.org/projects/o-ran-sc-nonrtric-plt-ranpm/en/latest/overview.html#data-flow
- latest snapshot version of RANPM functions support 3GPP file-ready event format & latest NR PM data files. Older (Release K) versions only support older VES-format file-ready events & older 4G PM data file.
- For debug/support please send an email, or use slack (Slack invite)
- Use 3GPP XML files, hosted in some FTP/HTTP server (HTTP server provided), then send a VES event to VES collector (with the path/filename to the new file)
- John Keeney (Ericsson EST) Avoid trying to use internal interfaces/formats/topics in the RANPM flow
- Usecase is energy saving also
- Lets work togther on related rApps / use cases
- Ref: Sunil's presentation above
- Ref: Discussion End-to-End Integration
- Lets work togther on related rApps / use cases
- Action: Sunil N Will check with Orange if possible to create a wiki page for the use case, to store snippets, discussions etc for future users & other rApps developers
RSAC Energy Saving integration use case (rApps & AI/ML)
- No update this week - but working away on this.
- Plan to be used to varying degrees in several venues over the next months
- OAI workshop (21-22 May)
- OSFG workshop (23 May)
- June O-RAN F2F - Fukuoka (2-6 June)
- From last week:
- Discussion End-to-End Integration
- Good progress made on O1-PM - convert to file format & reuse existing RANPM functions → rApp
- Note: RANPM snapshot images have timed out. !
- John Keeney (Ericsson EST) & Aravindhan Ayyanathan (Ericsson EST) - Recreate the snapshots. Good for another 30 days
- Make sure release happens before 30 days & update charts in it/dep
- Note: RANPM snapshot images have timed out. !
- O1-CM:
- When integrated SMO deployment is ready rApp should be able to use NCMP as a wrapper for RestConf → SDNC/ODL
- Exposed via SME to rApp
- Topology:
- Martin Skorupski will create a topology/deployment model - which can then be processed by TEIV to bootstrap the TEIV topology.
- Will help pre-populate the topology & add links etc - where adapters do not yet exist.
- Also TEIV adapter nearly complete; to poll NCMP/SDNC to populate TEIV-OAM data of ODUs/OCU/ODUCell/OCUCell
- Available for rApp to query which DU/Cells to target for Energy saving rather than hard coding
- TEIV can then be queried by ESrApp to get IDs etc & containment info needed - rather than hardcoding in rApp logic
- Martin Skorupski will create a topology/deployment model - which can then be processed by TEIV to bootstrap the TEIV topology.
- AIML
- John Keeney (Ericsson EST) & subhash to discuss:
- How & when training happens, & where trained model is stored
- How AIMLFW is deployed as part of SMO
- How rApps ML model is deployed as an Inference service for rApp to use (KServe)
- John Keeney (Ericsson EST) & subhash to discuss:
- rApps & xApp
- bimo fransiscus asisi to advise on where the current Apps are - to help identify how to extend for deployment.
- VES collector in SMO
- Can change configuration in integrated SMO (via configmaps - TBC), but need to download & make 3GPP schema files available somehow.
- May need to add a custom step to pull these files during SMO setup. (Similar for other functions where spec downloads might be required before use)
- Can change configuration in integrated SMO (via configmaps - TBC), but need to download & make 3GPP schema files available somehow.
- Will discuss more with fransiscus bimo during RSAC
- Good progress made on O1-PM - convert to file format & reuse existing RANPM functions → rApp
- Discussion End-to-End Integration
OAM (Martin Skorupski)
- No major update this week:
- Still working on deployment - currently still docker-compose
- Will update info on labs - e.g. now obsolete UNH-IOL & OpenWirelessLab.
JIRA:
NONRTRIC (John Keeney (Ericsson EST))
- Working hard on Integrated SMO deployment
- First version nearly ready for testing.
- Working hard on Nephio/ONAP/OSC co-location.
- Needs alot of resources - happy to see winlab machines coming on line.
- Still have a networking issue between nephio control cluster (native k8s) & nephio workload clusters (kind k8s) to deploy OAI nodes
- Next steps will include AI/ML platform integration
- To support ML inference service LCM via AIMLFW (as well as rApp manager)
- To help demonstrate training & model management etc too
- First version nearly ready for testing.
- Working on ES-rApp & use case - mainly as a requirements driver for platform. Lots to do!
- Need a sample ML model for a bootstrap/test inference service
JIRA
SIM (Alex Stancu)
- Working away on integration & Hybrid O-RU (working on demos with OAI & Benetel RU)
AI/ML platform project (subhash)
- Working on dynamic pipeline / platform
- Integration & ES usecase
- Minutes & Meeting: Meeting notes
SMO (Seshu Kumar Mudiganti)
- Meeting notes Meeting notes
- No specific update
Topology & Inventory: (John Keeney (Ericsson EST) :
- See vDTF presentation next week (TEIV/NCMP/SDNC)
- Will be integrated into SMO-install mentioned above
Meeting ends 60min