Goals

  • Status at the end of Sprint 3
  • Presentation by Yogendra Pal
  • Presentation by Ayumu Ueha

Notes

  • O1 interface
    • Not much progress in Dev Sprint 3.
    • Will open Jira tickets in ONAP, and tracker items in O-RAN
    • 4 tickets.
  • O2 interface
    • 4 major issues
    • Feature verification done
    • TST010 API compliance almost done
  • O1/VES
    • 7 tickets for the G-release
    • 2 closed
    • 5 being worked on. Most of them are in review. Will be merged soon.
    • Dependency on LF on Sonar and CLM job in Jenkins. Coverage report shows 0% coverage.

Discussion items

Yogendra Pal
TimeItemWhoNotes
5 minAgenda bashingAll
15 minĀ Presentation by Yogendra PalĀ 

15 minPresentation by Ayumu Ueha

Action items

  •  