Skip to end of metadata
Go to start of metadata
Date
Goals
- Define demo Details for O-RAN F2F in Montreal (Oct28 - Nov01)
- Define requirements for O-RAN-SC
Recordings
Table of Contents
Attendees
Please add yourself, if you like.
Discussion items
Time | Item | Who | Notes |
---|
05min | admin | Martin Skorupski | Next meetings - Tue 2024-10-22 9pm EDT by Rittwik Jana
Wed 2024-10-30 8am EDT by Martin Skorupski Cancelled. - Tue 2024-11-05 9pm EST by Rittwik Jana
Please note that US and Europe switched back to standard time. - Wed 2024-11-13 8am EST by Martin Skorupski (06:30 India, 9pm Taiwan)
K Release Timeline |
15min | O-RAN F2F demo | | Rough Schedule to be discussed: bimo fransiscus asisi Integration testing video being created - - NTUST lab has a demo with VIAVI energy saving (OSC SMO + RIC)
- XFAPI is not included in F2F demo (perhaps next release)
|
00min | OSC integration use case | @all | 1. bimo fransiscus asisi Preparing for he next F2F demo integration demo, 10 min video Energy savings demo Prof. Ray - purpose of demo is o use SMO and RIX platform and AI/ML provided bu OSC integrated with Viavi RIX tester shared the video with Martin FAPi integration - debug with Ashwini's help L1 or xFAPI issue debug with Prof. Vipin 2. ASHWINI BHAGAT no DL/UL config coming, L1 goes down wanted to run L2 first. Prof. Ray: Pls share document of testmac and FH library 3. JOJO維 requested for help - debugging ODU HIGH problem on high throughput - initial UE attachment is not successful
Ankit Barve - Debugging with OAI - NTUST NFAPI integration - issues with RRC setup msg Ray-Guang Cheng - ASN.1 compilers are mismatched. Nokia compiler is quite old. OAI compiler is newer.
- Typically versioning is backwards compatible.
|
00min | gerrit clean up | | https://gerrit.o-ran-sc.org/r/q/status:open,25 |
00min | Q/A | @all | - if any
- Tacker team would like to use O-DU-High/Low for deployment
- conversation between Ankit and Toshi
- Ankit Barve
- ASN.1 topic
- compiler issue - open-source git from Nokia used by O-RAN-SC
- discussions via channels are possible
|
|
|
| End of the meeting |
Action items
Decisions
References