Bronze Dev Sprint 4 Demonstrations

Bronze Dev Sprint 4 Demonstrations

Project

Date

Duration

Contents

Project

Date

Duration

Contents

SIM

2020-05-11 - Joint A1/O1
1pm UTC - https://zoom.us/j/436210993

 

10min

IPv6 connections between SMO (O1) and SIM and its different deployment options. 

recording (OAM Meeting Minutes 2020-05-11)

OAM

Non RT RIC

2020-04-29 INT weekly meeting

 

Near RT RIC

2020-05-14,  Zoom Bridge 2 9-10AM US EDT ( https://zoom.us/j/6540568082 )

 

2020-05-14 Bronze D5 - NO DEMO

Near RT RIC APP

O-CU

TBD

 

 

O-DU HIGH

13th INT weekly meeting

 

 

O-DU LOW

 

 

 

INF

 

 

 

DOC

 

 

 

INT