This page will contain the schedule, agenda, and minutes summary/details for meetings of the O-RAN SC Requirements and Software Architecture Committee.
Weekly Meeting Notes
Date/Time | Comments | Recording | |
---|---|---|---|
2024-08-14 RSAC Meeting notes | |||
2024-08-14 RSAC Meeting notes | |||
2024-08-07 RSAC Meeting notes | |||
| |||
| |||
| https://zoom.us/rec/share/y8uKG9K-Cbmv7lYOcdpX2bmDaaQ2qFoe_K7Xn_vM8kc-h76jjpbowMvAJ_hD3tzv.PA9SjZkAKMFjxCRP | ||
https://zoom.us/rec/share/S_t2Xbc-cw74VlkCFSnUJTSJ4n_QnTlLFQVwjIicmxJrxKxLLnii0CRIz25HgQrN.vvhxGHb6DQfF8i-w | |||
| O-DU high documentation is done wiki page cannot be updated; David Kinsey [AT&T] has been notified on this issue. CU image does not support O1. If O1 is needed, BM is the only option We would like to cloud native approach. To test E2E, better to use containerized image. Release is at the end of this month. bimo fransiscus asisi Open RAN summit at Taipei. Topics: Open Ran and 6G; Open RAN and open source; Speed up the SMO decoupled project. Use OSC Taiwan as the implementation testbed; Energy savings use cases have been demonstrated; Viavi RIC tester. Need to wrap near-RT RIC and non-RT RIC and SMO on top of O-Cloud for OSC Taiwan lab Peng Lu Intel is waiting for Prof Rathi's code base changes on xFAPI related to Flex RAN ODU low; Legal clearance has been obtained; Still waiting for detailed information on how to access the code; OSC Taiwan lab can potentially obtain the code (binary) from Netweb; | https://zoom.us/rec/share/Q5pqZ3Pk4nNGEhSDFFQ7wZEtEbuxIatD0EmOML1tMwKvI1Mehqn0A4qCcKnTKc0o.0nXJiLydImvTv46A | |
| Peng Lu (Intel) NTUST labs (Bimo, Prof. Ray) Ankit Prof. Rathi TOC mtg | ||
| Still waiting for final legal clearance from Intel. Technical issues have been resolved, currently it is more of a business issue/process to finalize the legal clearance. Also waiting for access from Prof. Rathi pending presentation at the TOC which was cancelled last week. Expect that to occur this week. In the architecture presented last week the WLS code is part of the ODULOW project and is used by ODUHIGH. Since the xFAPI is below the WLS layer it should be part of ODULOW even though it provides implementation access to current ODULOW base or the OAI L1 or potentially other L1 implementations. Plan to request a WG8 session with OSC/O-RAN members to discuss Interoperability testing of different L1 implementations using the FAPI interface, which may include the transport protocols (WLS) interfaces. | ||
| @ankit Prof. Rathi provided an overview of xFAPI; had discussions with Intel on how to release xFAPI code to OSC discussions with WG8 starting to introduce xFAPI to O-RAN @bimo requested @johnkeeney @martin @alexstancu
| xFAPI architecture | https://zoom.us/rec/share/v64WGduTqzUuivsXiTGKe5funy6PBmH2TTPyqFs3yj7p3XYaFKrrzoSORUWnkRr5.tvP2vX6QmEegDHiG |
| Updates from One summit Ankit Barve Requesting Prof. Rathi's xFAPI code base to be uploaded to OSC repo Peng Lu Intel still having conversations re Flex ran version for OSC going forward (deprecate old version and move to a new version Ray-Guang Cheng Requesting Intel to provide resources to support the O-DU low / O-DU high integration work and also with xFAPI integration in NTUST OSC lab. Peng Lu is looking to support this work in NTUST lab. | https://zoom.us/rec/share/Viv0NmRnBMYsddtC4zXkxIz1QvhA1j34CopIut35xAoqE8U3Be1ottJH36O4A9V0.06DhCzACIMneKnJn | |
| Need plan from ODULOW (Peng Lu ) on how the FAPI update from the x-FAPI (Prof Vipin) will be incorporated so we can establish some timeline expectations. lab status of NTUST | ||
| lab status of NTUST | ||
| ODULOW has discussed progress with Prof. Vipin Rathi. It seems that there are some changes to the FlexRAN code. ODULOW believes there is some ability to use his FAPI changes into the ODULOW base and they will be collaborating with Prof Rathi to incorporate those. We then should be able to move away from the Release "F" baseline we have been using. OSC Taiwan Lab still waiting on Radisys to renew the OCU License so that we can continue to use the binaries in the end-to-end service path. | ||
| Integration: Ankit Barvearranging call to test with Intel Ashwini (Intel) - repetitive messages observed on Uplane UL Prof. Ray (NTUST) has linked Prof. Vipin Rathi from Delhi university | ||
| Update on TUWU fransiscus bimo problem in ODULOW but there is also a problem in RUSIM. Working on closing the RUSIM while the resource is available. Then need to work on OSC ODULOW. ODULOW is working on a plan on how to upgrade to a newer release. Intel is working this. It is hard to get developers/students to sign up for work on an outdated version. ODULOW Peng Lu will look into being able to match the Viavi configuration for OAI ODULOW. This will allow easier transitions from one implementation to another. | https://zoom.us/rec/share/8SoLq9WMWSkMd5evbuy7-f2hNQz56Oau03QLwaML5OX4vSTXjGDPj-kcYcQjQ8nc.4D0AJ-G7Dg_9m_MW | |
| Ankit Barve(O-DU high) bimo fransiscus asisi Ray-Guang Cheng (NTUST lab) Radisys O-CU O1 and E2 and E2SM versions? Martin Skorupski Alex Stancu Martin/Alex OAM/SIM John Keeney (Ericsson EST) Non-RT RIC James Li , INT project | ||
|
| https://zoom.us/rec/share/uqDMA8FNNrb4oSoHxqJFXMxbAmaehT5AE-jQvvA3T3L3JL-CpDsTOL-R0JyaB6I2.q0MaRcvFVSggARCW | |
| TOC mtg for 3/7 will present items 1 and 2 below Project review
| https://zoom.us/rec/share/cuTPTeOF40sr54vWtupo2iHGmS56ZGAptuqFBtNQ9ELANU-mTYiraufTqjSLo_UB.S931l5MWTYEOP0qq | |
| project updates O-DU high (Ankit Barve) integration in NTUST lab, PTP integration issue being resolved OAI lab interaction re FAPI implementation, L1/L2 shared memory OAM (Martin Skorupski)- scanning Yang message specification changes and incorporating in OAM code base SIM(Alex Stancu) - waiting for Ultan.Kelly to finalize on procedures for Viavi simulation data release NONRTIC(John Keeney (Ericsson EST)) - focusing on rApp mgmt INT(James Li) - working with PTLs to document pair-wise integration scenarios SMO(Seshu Kumar Mudiganti Toshiaki Takahashi) - Tacker plan integration with SMO components progressing Create RSAC slides for F2F mtg Rittwik JanaDavid Kinsey [AT&T] | https://zoom.us/rec/share/VDu3O0dEwMSTv8awA4RJe8HcCzXzoMeYqr78VsFek33TuHFRvrBxeK9rjwX3Y6PJ.tHYfPDyldhd4JfGV | |
| AIML ES Data set available (TIM), Viavi data is semi-private, password protect the file. A procedure needs to be in place for users to request access. Who approves this but it should be a “written” response to provide access traceability. Another option is to have the data in the labs but not in a repo/nexus. Access to the lab would provide access to the data. We need to bring to TOC to ask Viavi what procedure we should use. | https://zoom.us/rec/share/h56Ft26clrbIC9GAjfltoVWsc87QhM3ttqkrw8zS9fM35_LbKqfTzLF65dbawXbm.a46RjNseavdivWgA | |
| O-DU high integration project for J release | bimo fransiscus asisi Present the OSC Taiwan Lab status. Slide: https://wiki.o-ran-sc.org/download/attachments/3604609/OSC%20Taiwan%20Lab%20Status%20-%20Jan%2010%2C%202024.pptx?api=v2 | https://zoom.us/rec/share/sloIP1qERdFKjURx_yOX19IP-qNniLsbeh3tu3al6wCL5iQSKlXhhxNxZHkVMOm7.AL_M5NWfTJll8K6G |
| Release Readiness RSAC holiday schedule rApp Mgmt Demo (20 minutes) | Still work for projects to complete on Release "I" page to document the release by tomorrow's TOC call. Tuesday cancelled. If it becomes needed we will need to ensure someone can open the bridge. Wednesday cancelled. Tuesday cancelled. If it becomes needed we will need to ensure someone can open the bridge. Next RSAC meeting Wednesday | |
| Use RSAC portion of next week SMO+RSAC (need to confirm with Seshu Kumar Mudiganti ) for rApp Mgmt Demo (20 minutes at end) | ||
| February Demos:
OAI/OSC Workshop Outcomes:
ES Capabilities
| https://zoom.us/rec/share/-rPys3Nex_sGz3U5bY6egaqn3I2nHozvisdrryWZCVNtcxBDqmCCp0YlLUDjT-oA.c_rMi5MnRluyAoBs | |
|
| https://zoom.us/rec/share/sJJ5i_fTHKFOPpwJdfl6tDuyVq4kdTluACT9BIQi29x2szNR9udYS2KZIY_HPA0.J39w8OpxmszCCumS | |
|
| https:// |
lf-o-ran-sc. |
atlassian.net/wiki/display/RSAC/Contributions?preview=%2F3604609%2F97452034%2F20231101_Options+of+CD+for+OSC+Lab+interconnection.pptx | https://zoom.us/rec/share/3waaAWECFtIz_BiA-BJBW81FbO6nvijkBYqsPyJJixZnra6t49BdKYoAe-fM0Cts.59Yh0Z6qJIolQVBh | ||||||||
|
TIM data set representing the “Internet” usage from the network, for 2 months (Nov and Dec 2013, timestamps every 10 minutes) in our nexus: https://nexus3.o-ran-sc.org/#browse/browse:datasets The data is parsed, meaning we pruned the voice and SMS usage, keeping only the Internet traffic. The values themselves for the usage are normalised to a value known only to TIM (assuring some anonymisation). Other references: | https://zoom.us/rec/share/0m92F1uqMNSCm2P2lO9Mdg1tjBF2ONiIurW3en5XOY_Tll4xs7nSSu0Ow3zVYejg.090--88PRbKXIUbh | |||||||
| ES MVP was presented by Awn the Rapporteur. There are specific details in the feature for mapping progress and alignment. Suggestion is for PTLs to review the material and identify their alignment for F2F reporting and updates to the TSC. Look to Project documentation Discussion for "J" Planning regarding Energy Savings MVP
| ||||||||
|
| https://zoom.us/rec/share/1SJ34i5-lk3ocHxTUrnb1MkOeGZyLBMpVolbOh6iR4p8Tjus_dTVHlr2MxEh33JS.O_wsroaBVIl__rTA | |||||||
| Energy Savings
| ||||||||
| Energy Savings
OSC Taiwan Lab Update:
Sprint 1 Reports
| ||||||||
Lab Update
| |||||||||
| Feature Updates: Disaggregated SMO Flows Demo - O-Cloud & SMO Deployment (Yi-Fan Li)
Onboarding and Orchestration Tacker Update (Toshiaki Takahashi ) RICPLT Feature Planning (Thoralf Czichy )
Deferred to Next Agenda: Energy Savings E2E (Rittwik Jana , Alex Stancu ) ONF Collaboration E2E Call Flow Pairwise XTesting (James Li ) Lab Integration OAI Collaboration Bedminster Update (David Kinsey [AT&T] ) | O-Cloud and SMO Deployment_NYCU_2023-0807.pdf | https://zoom.us/rec/share/N00RXWnJ3EpGRtCn7v7opTWCrcue44W7eJDsgf8bJzqzFo9AnyK1atAUFO2LN7XX.KBgUhfvk6nYhVtSX | ||||||
| I Release Planning | AIML - Joseph Thaliath
Feature 2 - N.K. Shankaranarayanan
Feature 5 - James Li
Discuss Feature 1 on 8/2 SMO+RSAC call AP: David Kinsey [AT&T] to get with Thoralf Czichy to discuss RIC Platform Feature Planning. Feature Lab Interconnection - bimo fransiscus asisi
| |||||||
| Preparation for I-Release | I planning
| https://zoom.us/rec/share/PRon2VUUIdXdUSvXm3hWNQNfBn3qBTCPTGZkRQ45hZl4r2h2-PUP3cm6y7VnwKZS.D5xkze6DDLVyi4ff | ||||||
| Preparation for I-Release |
| |||||||
| RSAC/SMO joint mtg | ||||||||
| O-RAN F2F Osaka, June 21st, Session 4 RSAC Planning call | Discussion of SMO proposal with SMO and AIML MVP-C feature rapporteurs for alignment. | Video Recording: https://zoom.us/rec/share/CpBTUsrfR_DbMhWjSfunqefJlJ5IdlTIrJfCR8hKi_bmIyCS3SMwUwQz7gURbz-N.Gc3I3tH_8IhNd8Gh Audio Transcript: https://zoom.us/rec/share/ZXaRzYY63FSyScNkhCjjZJojxu2ZyFEgXCLRI51msnnNWQV06qwDXppLvq3XaU5E.dgfvh_HlNI6TOtdS | ||||||
| O-RAN F2F Osaka, June 19th, Session 2 RSAC planning call | Discussion on proposal for joint SMO. | Video Recording: https://zoom.us/rec/share/fyx3eg9x9l0DWC3NuL4RM2pu528JD_WIgHqEwAEBAybPoupJjsYm1BrIT4JzCeiz.GW_kjJROY2JMUv3z Audio Transcript: https://zoom.us/rec/share/0kzzXpJDzyPLjFilIOF5oW9u49_QqOtNbYCxSN9QxzjtFfgunvFL2YXDviuEcibx.qK7U4YUCNf_9txTB | ||||||
| Japan F2F OSC Demo Preparati | ||||||||
| Japan F2F OSC demo preparation Demo Suggestions from O-RAN Office (Zbynek): For demos in Osaka (in case of pre-recorded videos) I would like to share a few suggestions aiming to improve the delivery of messages to the audience:
Would any postprocessing be required from O-RAN Office side, for the Osaka demo videos? Note: For the demos that were shown in Madrid (Oct 2022), O-RAN office arranged adding demo titles to the screen and some further postprocessing to allow playing the videos in a loop. In case any assistance needed for Osaka demos, we would need the videos in advance – the postprocessing takes some days… General note: If I recall the way OSC demos were presented in Madrid, Oct 2022, in my opinion – frankly – the content of the demos wasn’t easily digestible in the way it was presented. The videos were long (10+ minutes), rather poor quality, sound was hard to understand (and couldn’t be played loud to avoid disturbing the networking space). As O-RAN office could observe, not that many people looked at them. Hence the above suggestions to improve the presentation and delivery of desired messages. Demos: Demo #1 - NTUST: Slice-enabled xApp control ODU Scheduler fransiscus bimo Demo #2 - NTUST - RIC Test with KPI-Mon Demo #3 - RIC E2 Reset Japan Session Planning WG2, WG3, WG6, WG1 = 1 hour session Co-Chair or Work Item Rapporteur if associated with a work-item 3 Questions from each PTL that would help the project. Questions should be targeted for a specific WG or WI team to answer. | OSC_Taiwan_Lab_F2F_Demo_v2.pptx | https://zoom.us/rec/share/RQkxiMTUfBARy5CvI6spwF08XpIxWBi__YU6rJgR9bt5k8JXKkZiVq7wqLCA_bA.EknUZaGDh5tKDG8g | ||||||
| NTUST lab updates Japan F2F OSC demo preparation | https://zoom.us/rec/share/63qeU4ckOPijVCpcoIkyuuxitE8cayWyLvOlGeF0nrC6XYWYFPrgLTuvzvBj5gon.n3cyU9gWPoEFPHLS | |||||||
| CAPIF demo ASD demo |
| https://zoom.us/rec/share/xA7poZRNchi7tjkP1HhuEF51-8b-k3CZMrw-fc2B1W1Kq5PibjF0D_r7HLG7G7IB.xNVroBYSCLKtdjCZ | ||||||
RSAC mtg O-DU high tests continuing in NTUST lab bimo fransiscus asisi to reach out to Jon Zhang WR to help install a simple example NF and O-CU in NTUST O-Cloud; | |||||||||
| Combined RSAC/SMO Lots of new people, roll call used to introduce participants and area of focus ODU-HIGH - Lab integration update SMO - Integration Vision from Seshu/John/Martin |
The agenda of this slides is to give a brief intro to Nephio. Explain what and how K8s operator works. Use of a K8s operator in the automation through Gitops. Slide 20, depicts the different ways of integrating the operator with other open source solutions, this is NOT to promote using all of them together, but to show how and what part of the solution is being tackled by each of them and a possible way to re-use the O-cloud operator across them. | Audio Transcript: https://zoom.us/rec/share/8GW-mBx4-O6qB2pT-uY9TuQzdoxCFGhm_wZZMvlPcaP15XrmzY91FE4uNUOMq2fn.1bB9poiEiTNH4PIS | ||||||
4/11/2023 | NTUST lab: Debugging session on 4/14 with Radisys, Intel to make system operational with TM500 OAI components are working in NTUST lab; Need a use case to drive OSC and OAI interop INT project is working on X-testing platform to onboard near-RT RIC | ||||||||
4/5/2023 | Invited Amdocs/Quali to give a presentation on their CD/CT platform, titled "ORAN: Continuous Deployment and Testing" | ORAN: Continuous Deployment and Testing | Video: https://zoom.us/rec/share/hJZOEm1sVMMILXdjJIIgdXZVJpL-AXCs5IEuDtoIcAyNhEI2kljIzwtJ0fqZvsU5.x7TgBGKVV9yKIwUM | ||||||
3/22/2023 | Andrea Buldorini: SMO Decomposition and how that applies to OSC AP: Formalize NFO/FOCOM Use Cases for "H" for submittal to WG1; assigned to David Kinsey [AT&T] Shankar: Open-Source Harmonization with OSC |
12518526/TIM-2023.03.22-OSC-RSAC_Architectural_principles_for_SMO_Services_integration.pdf?api=v2 |
3/8/2023 | NTUST Lab: Ankit was unclear if lab was reverted. Prof Ray indicates the server is the same they have been using. Bimo there was some work for integration to real RU but now is connected to the TM500. Ankit to verify if change corrects the blocking issue. O-DULOW no plan to upgrade to newer version. Willing to provide bug fixes as needed. ONAP projects with OSC synergies not yet available. Work is in progress. SMO Function Flows. Discussed current work for O2IMS Cloud Registration and Discovery flow and Homing Flow. | Audio Transcript: https://zoom.us/rec/share/TTR6lFw7o_K-u8NKhKTOJzm_zS4CisX-di1QEhRnvw5Lo4Z85PsarvNNrCXMYM-S.mnAh9buqT2J6gCto | |
2/28/2023 | AI: Ankit Barve requesting NTUST lab to revert to old lab so that O-DU high testing can progress. Integration testing is stalled for the moment due to ATT lab's unavailability. Dennis to ask Prof Ray and Bimo (bimo fransiscus asisi) and report back to RSAC. AI: Ankit Barve requesting O-DU Low PTL (Lvfarias (Deactivated)) for new release s/w version 22. O-DU high is currently using version 21 of O-DU low s/w. | ||
2/8/2023 | Timo Perala (ONAP requirements co-chair) provided an update on ONAP projects that are related to OSC. AI: Timo to work with N.K. Shankaranarayanan, John Keeney (Ericsson EST) and Martin Skorupski to come up with a list of projects that have synergies/touchpoints with OSC | ||
1/25/23 | OAM Project
SIM Project
INT Project
| https://zoom.us/rec/share/CrsxvAC6UYiaZLf0hJ7OXMXVP0VjTd-VocidgOS9YiQ5GUYXL8e8ZrnH3n8675ie.sNaZ9mYkLrSQ6cG- | |
1/18/23 | SMO Project
INT Project
| https://zoom.us/rec/share/N61MtSYjv8kMdACzOX9-bPbKjVBIb62IeQy7hx1dtSZIrkPJNEs1mlnkz0zDWMLo.RTCzcnSKkJBecMv0 | |
1/17/23 | End-to-End Lab
O-RAN F2F
NTUST - ODU Scheduler Decoupling so that different schedulers can be used.
| Open RAN Work Shop on Feb 13 and 14: https://www.knaintl.com.tw/2023OpenRan/ Need to ensure O=RAN F2F does not conflict. | https://zoom.us/rec/share/SE5Ea0Md5dJb2SGjiqwRWbC4D2mrSWNfLlKb7rAp9tckiHWDaFnE4BImgioa0s5O.uYAIzkptRuJWzJlh (Recording seems to refer to a RIC PLT project meeting?) |
1/11/23 | "H" Release Planning - Are we ready for O-RAN F2F? AIML
O-DU HIgh
TACKER
OSC/ONAP
NTUST
| ||
12/28/22 | Cancelled for Holidays | ||
12/20/22 | Cancelled for Holidays | ||
12/14/22 | Blockers for Release "G" Tacker (SMO) - Ready AI/ML - Ready O-DUHIGH - Move blockers to "H" Backlog Some Cleanup is needed, this will drop the Lines of Code this will be done during the maintenance release. This will not result in any functional change. "H" Activities OSC - OAI Integration Possible Options: End-to-End using OSC RAN and OAI Mobile Core can be incremental in where the workloads execute. Target would be to use O-Cloud? Goal: End-to-End 5G Open Source Network Possible Options: OSC SMO Integration with OAI Elements Goal: Would standard manageability Possible Options: RIC-RICAPP Portability OSC RIC with OAI RICAPPs, and vice-verse Goal: xApp Portability Step 1: What would it take for SMO to deploy in a (OSC or OAI) lab a OAI CN element. Goal: Explore the gap between OAI NF and OSC Infrastructure/SMO. OSC - ONF Integration Possible Options: RIC-RICAPP Portability OSC RIC with OAI RICAPPs, and vice-verse Goal: xApp Portability Tacker "G" Update Supporting 02DMS-ETSI looks like part of Cloud Can be configured with K8s API which would be like a consumer of the O2DMS-K8s and therefore deployed as part of the SMO For "H" we need new SMO functions for Homing, Inventory, and NFO. These can be minimal in which ASD support by Tacker would consume the O2DMS. Need to work out how Tacker for ETSI as a O2DMS-ETSI is registered with SMO, vs Tacker as a NFO extension, uses the O2DMS-ETSI. Could NFO then just use the passed Tacker instance as its orchestration end point? | ||
12/7/22 | |||
12/6/22 | SMO/OAM/AI-ML/NonRT RIC/O-Cloud Integration for Release H
| ||
12/5/22 | Release H Planning
Lab Status
| ||
11/30/22 | Release H Planning
Lab Planning
| https://wiki.o-ran-sc.org/download/attachments/3604609/Report%20on%20Tacker%20G-Release_for%20SMO_October_r3.pptx?api=v2 | |
11/23/22 | Release H Planning
| ||
11/22/22 | No Meeting | ||
11/16 | No Meeting | ||
10/05/22 |
Next week video submission 10/11/22 deadline to RSAC https:// |
atlassian.net/wiki/display/RSAC/Contributions Create a short OSC overview deck, accomplishments and status update for G release (Jinri, James, David, Rittwik) AOB | https://zoom.us/rec/share/fPmuXD5hu8AuQU-05TgSMweWDUXScoDv9E2ly9XhFUhBByEthIMGapdgBrinurHM.Pn6IuIu9B6XFeV3c?startTime=1664971419000 | ||||||||
9/21/22 | F2F Agenda
"H" Planning
O-DU
| https://zoom.us/rec/share/KucELauhPH0LQzNmQwHWch53gVm69HTHNqkDFgvAUbjRjL2X38fJqiUVUI_qWLyx.QzG7L4iG0JHLCg0u?startTime=1663762137000 | |||||||
9/13/22 | O-CU Deployment into O-Cloud O-DU Status | 190 Server should have images and HELM but currently doesn't allow SSH. – Rich to Check... Once SSH is re-enabled then we need to know the directory 10am Eastern Thursday Ankit (O-DU), James (INT), David (RSAC), Jon (INF), Rittwik (RSAC), Bimo (NTUST) - David to setup meeting | |||||||
9/7/22 | AI/ML Project status Madrid F2F agenda NJ Lab Review O-CU deployment O-DU 190/191 reachability issue |
| https://zoom.us/rec/share/zcZ9EaeIBL28A9iJO_ZNWFRkP7moXf7pPyJkCr1lj-BBuczBQ13hz31zmgd0H7Rw.-LhYMD33cmeqK-pN | ||||||
8/24/22 | Demo Availability for O-RAN F2F Oct 20th 4:30pm-7:45p, Madrid
AP: David Kinsey to schedule synch up for OCU Deployment from SMO via TACKER using O2 Interface from INF. | OAM - VES Standard Defined Message SIM - Yang Sim or E2 Sim demo - Potential Integrated demo: SIM VES Generation, OAM Collection, SMO Storage in InfluxDB CU Deployment Non-RT RIC: Will come up with something specific for O-RAN AI/ML: Joseph will look into what is possible from the initial seed. RICAPP: No data RICPLT: No data SMO: No data | https://zoom.us/rec/share/XDUKKQ2vKhmv92N8vMZjFmQCB8IklCHRw2VtYNb0C9WzGPDlqZTnh4iTJxSertFV.OYT2xNtpFXtfTY7Z?startTime=1661342737000 | ||||||
8/16/22 | Draft Agenda: Demo Availability
| INT Project: XFT Framework demo Wed RSAC Sep 21st. Will record and make available to Tue participants. ODUHigh: Demo Sept 13 or 27 Handover feature from "F"; Stub based demo; In Local Dev Lab. End-2-End will be prior release tests: Closed Loop tests. | |||||||
8/10/22 | Draft Agenda: Demo Availability
| INT proj (James) to set up discussion for XTF testing framework AI/ML proj to provide a repo structure AI/ML project to interface with SMO project to understand the touchpoints OAM project is working with Tacker proj for initial integration | https://zoom.us/rec/share/tAg4xrQrFVS77ptka3MGWk1BsC8xK7INBLkcRfMfoK7Nh3g87NoaaQ2MChu2RPNu.QDw9-JWJhP_SPSvD | ||||||
8/2/22 | Cancelled. | ||||||||
7/27/22 8AM Eastern | Release "G" Feature Planning
Lab Status
AI/ML Project Proposal |
| |||||||
7/19/22 9PM Eastern | Release "G" Feature Planning
Lab Status
| RICAPP Meetings - RIC Applications - Confluence (o-ran-sc.org) | |||||||
7/13/22 8AM Eastern | AI/ML Deployment Options
Release "G" Feature Planning
Lab Status
| https://zoom.us/rec/share/XkyYHgU9bu-mxQjPMLCw9qTai0J6c0vAPVYG-CrN0uQ-niRNyXJdlY4Z6fcgRcvp.wNYgxQmILnksoaTM?startTime=1657714580000 | |||||||
6/29/22 | Reviewed proposal for new AI/ML Framework project |
| |||||||
6/15/22 | Reviewed proposal for new AI/ML Framework project
|
| Topic: Zoom1 O-RAN SC's Personal Meeting Room Meeting Recording: | ||||||
6/7/22 | James Li | ||||||||
6/1/22 |
| ||||||||
5/18/22 | IXR Should be ready by 5/20/22. We found a bad optic cable and are replacing it. OTF is permanently down, we are soliciting ideas from PTLs for new test automation tooling or ideas. INT needs each PTL to create a "Healthcheck" type of test/script in which the project can be deployed and verified as "healthy". INT will then look for interoperability across projects. This will require participation from the individual projects and is not something INT can do entirely on its own. We identified while working towards the OTF workshop that projects sometimes assume things still work, when in fact they don't. This verifies the need for automated testing. O-DU HIGH needs O-DU LOW to install/verify the latest build in installed in the OSC lab. David and Rittwik will reach out to ODULOW to ensure there are not any blockers. | ||||||||
5/10/22 | OTF workshop postponed to next week. Here is the progress in Taiwan OSC Lab (Prof. Ray): - New results
* Topology: PHY-Stub <--> OSC O-DU-High <--> OAI CU: RRC Connection Setup is done. 2. Tested the S-Plane in Chunghwa Telecom (CHT) * Topology: GM <--> O-DU <--> TM500 RU Simulator - New partner: Auray will also provide their TM500 to support the OSC testing. Auray is also running OTIC Lab. in Taiwan - On-going jobs
- On-going jobs in Taiwan lab and need support from Radisys.
Ankit: This activity has not been planned in F release and will be taken in account during next Release planning phase (G release) 2. We added an E2 Handler in O-DU High and connect it to RIC: Ankit, please reply with an email showing your plan. Ankit: As of now we are reaching towards end of the F release and do not have bandwidth to accommodate these changes with review. | ||||||||
5/4/22 | Lab update
| ||||||||
4/7/22 | Lab update
| Topic: Zoom1 O-RAN SC's RSAC mtg Meeting Recording: | |||||||
2/15/22 | Lab Update
| ||||||||
1/27 | Lab Needs
| ||||||||
1/18/22 | Developed "F" Release presentation from previous meeting notes. |
| Pending | ||||||
1/13/22 | "F" Release
"G" Release
| Pending | |||||||
12/16/21 | Next Meeting 1/4/2022 "F" Release
| Pending | |||||||
12/7/21 | Lab Status
| ||||||||
11/18/21 | Lab Status
"F" Release
| https://zoom.us/rec/share/2Ggm5GJQJWvDzrA3-vxlYvrsCaO0cLu8Tx4vu-FFlUmElUGOdizEZjI7yklmSjiM.hyT66734IjysF-AF?startTime=1637244292000 | |||||||
11/4/21 | Lab Status
"E" Release Status
"F" Release Planning
O1 CR Status
| https://zoom.us/rec/share/uJ0gCsx7KSwubqW1DwcNG5xaldeiVzlXq05ejDHpFOPS9Qr7cOMNHmCewRrgTFfL.YCOUwMAxH2e89Kt4?startTime=1636031158000 | |||||||
10/26/21 | NJ OSC Lab
Taiwan OSC Lab
ODU-H Integration Testing
| https://zoom.us/rec/share/chDfuoamAypa3jsfZ47eY47d4vfmHW-xCufLciPhEoFVDj-pMEWqCuDK0Gto7eyu.OV6a-kYkwr7vHm7F?startTime=1635296571000 | |||||||
10/21/21 | Release "E" Slice Reporting
| Not available | |||||||
10/12/21 | CR Status
Lab Status
Slice Use | ||||||||
10/7/21 | CR Status
Integration Status
3GPP
| gNMI Interaction Diagram: gNMI - OAM - Confluence (o-ran-sc.org) | Recording not available. | ||||||
9/28/21 | Lab Status
Slicing Use Case
| https://zoom.us/rec/share/1VPBXmcIYIsUKBH6e5SPLt8tpcgjcYhcKY5JxpjIKa-PDabP8mClrchmHasNbyNT.9R_YDUGFmdXvZzpZ?startTime=1632877353000 | |||||||
9/9/21 9AM EDT | VES Improvements
Scorecard
| https:// |
lf-o-ran-sc.atlassian. |
net/wiki/download/attachments/ |
13570027/VES-Collector-Flow-Diagram-V6.pptx?api=v2 | https://zoom.us/rec/share/ggg96yruOV5QYeqXhm_KLok2BvgF-LYG9u_HqAfYTiTmGOw0McgXG1vgtuGgu3yw.GKsYNbN9T7L3c4mQ?startTime=1631192770000 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8/12/21 9 AM EDT | Reviewed Slicing End-to-End call flows presented by Former user (Deleted). Need verification from Viavi on pre-configuration of Slices within Core and UE simulator to request admission to a Slice. Reviewed VES Project to EPIC list presented by David Kinsey [AT&T], need to work on iteration and resource mapping. Need OAM, SMO, and SIM PTLs Discussed PTP Grand Master availability in the lab. David Kinsey [AT&T] to reach out to Nokia for status on FHG and how it provides/interfaces to PTP. E-mail sent today. Discussed using format of ODU-HIGH Release "E" plan to formulate a release plan with one for each project. David Kinsey [AT&T]to send that. E-Mail sent with proposed template. This would replace the single 9MB growing powerpoint with a per-release plan. | https://zoom.us/rec/share/DfNh8uXm-Y4dEu28INBRqBNGpQtOum2wbveezeDBax9AkhoqflbNoetP6z7dpp2R.Q9ENxTOcereld7YM?startTime=1628773650000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7/22/21 9 AM EDT | Meeting Held for discussion on Release "E" Disaggregated VES Reviewed proposal and discussed options. No Conclusions yet as this was more informatory. Next Meeting will try to work on specific deliverables by project. The attached presentation includes comments and on-going work between David Kinsey [AT&T] and Martin Skorupski which will be reviewed with the larger team at the next RSAC call. |
| https://zoom.us/rec/share/ENNFTIViSpkG6rBCzF-myIbR2i9WPzje9v7dBL0fGAI2ZM0uveyHqqBP0SkLGa3s.GQS0sL3rPgPErPsc?startTime=1626959214000 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4/13/21 9 PM EST | Discussed 5G super blueprint for E release DU - RU message interaction blockers TM500 equipment preparation by Viavi for delivery to OSC lab NJ | Meeting recording: https://zoom.us/rec/share/DuzSNJy8-iAE-ll5JAh-GR4LEgHH4N3_J6on5A3p2O0TqShiW4Lfp5v1WwZhRRmk.O1sBLrdw6K86qN-E | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4/8/2021 | Meeting recording to be listed to the right once it is available. Went through Release "D" Flow:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/11/21 9am EST | Meeting recording listed to the right. Went through Release "D" Control Loop:
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/1/21 9 PM EST | Former user (Deleted)to share Config spreadsheet to Ken Trudgeon (O-DU--O-RU interactions Mahesh Jethanandani Review recording for APP onboarding schema (from David K) for D rel implementation | Meeting recording https://zoom.us/rec/share/B4mbnreNFgtNSndiu54gVkpx_C-89rO5ofRQ8hAbSjSx8jEOdAUrbaKVD1n2wJA3.Hdvyxfpw6i0lj6To | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2/25/21 9 AM EST | Discussed RU failure recover use case Zhe Huang (Felix) to provide DHCP and CA server in OSC lab to bootstrap RU startup Viavi to check steps 1-8 in O-RU startup in 2. ORU Startup Viavi to check steps26-27 in O-DU startup re Alarm subscription in 3. ODU Startup Former user (Deleted)to check steps 12-23 in 3. ODU Startup – implementation task | Meeting recording | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1/14/21 9 AM EST | Discussed RU failure and recovery use case (ppt attached) Former user (Deleted) to create call flow for use case |
| Meeting Recording | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11/19 9 AM EST | Discussed O1/A1 use case for Dawn | Meeting Recording https://zoom.us/rec/share/VFSBeQa7lt1AlmAR3VIm4Sc8ooVaIOeMNiVbBKcB3MUOj3OCmK1hMozwT8PjFfpo.ATGZ99NFppAp5jbo Passcode: 5aKgaDF= | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9/15 9 PM EST | Intel servers configured in OSC lab for O-DU testing Intel and Radisys installing DU-low and DU-high s/w this week; SCTP libraries need to be installed; Former user (Deleted)to reach out to Rich for help Ganesh Shenbagaraman checking internally for compatibility for O-CU s/w contribution from Radisys (closed source) Ron Shacham to provide simulated trace files to Alex Stancu from Viavi sim into SIM repo Former user (Deleted) David Kinsey [AT&T] to draft preliminary plan for D release; Requesting All PTLs to start thinking about D release work epics and Cherry flow over items | Meeting Recording: https://zoom.us/rec/share/kqC7KdRNI3DMrDUNktdYl5OCw49pLaDtvq18hFYByNYixatyCBf9kLomcrngPsoU.GuHU_cB9kpTPc80W Passcode: Qw*z$6Zb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9/1 9 PM EST |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8/18 9 PM EST |
| TIFG-OSC meeting slides
| Meeting Recording: Access Password: zYN&Hv3s | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7/28 9 PM EST |
| O-DU High status (PPT attached)
|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7/16/2020 9 AM EDT |
| Meeting Recording: Access Password: y$SNs?w7 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6/18 | Sachin Srivastava Zhimin Yuan (Deactivated) to discuss on bronze maintenance release testing (P5 msg exchange, etc.) Xiaohua Zhang to check for testing possibilities for DU-LOW and DU-HIGH at Windriver Former user (Deleted) Former user (Deleted) to check on OSC lab status for L1 stack by 6/30 Eng Koo to check with Ken and Ultan on Viavi providing sim log files for TS scenario by 6/30 Eng Koo to share common config file IOT profile between O-RU, DU-Low and DU-high |
Common IOT profile | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5/26 | INF project cherry epics
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5/12/2020 9 PM EDT | Topic: Cherry release planning RSAC requesting PTLs to start suggesting EPICS for Cherry | Meeting Recording: https://zoom.us/rec/share/_MNPDa358UdLU6_z5WOFSoU5RoD9eaa81XVI8_ZbmkcBCuOWw4yrnsdVdhi8p5EC | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4/28/2020 9 PM EDT | Meeting Recording: rsac-20200428.mp4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4/9/2020 9 am EDT | Eng Koo to setup meeting with Former user (Deleted) Ron Shacham to discuss Viavi simulation parameters for traffic steering Sachin Srivastava Ganesh Shenbagaraman to setup meeting with Eng Koo to discuss Viavi testing with O-DU HIGH Martin Skorupski to draw up some some slides on cherry release requirement for s/w mgmt of X-RAN RU to O-RAN RU Alex Stancu to setup meeting with Ron Shacham for 4/13 on E2 simulator enhancement | Meeting Recording: https://zoom.us/rec/share/_O1XaLvRq1hIbtLJ9BHwC_IaG97kT6a82iJN__oOy03-Jo1PbYyzxOVn-laYgrt_ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/26/2020 9 am EDT |
Viavi's short term and long term proposal for OSC
| Recording: https://zoom.us/rec/share/5M5-c6jQq19Ie6_Esxjya-l5QIK7eaa81CkX-_EPz0ck7uwj9UffQWKJEx-zgI2E | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/10/2020 9 pm EDT | Bronze rel. – PTL reports from ODU LOW, INT | Recording: https://zoom.us/rec/share/4OFfdZDh-FJLeInJslP2Zq94RJy9eaa803UdqfVYyS1yYKZBLNg2trHEvI1-dNQ?startTime=1583888670000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3/3/2020, 9 am EST | Bronze rel. – PTL reports from RICAPP, O-CU, ODU HIGH O-CU
| Recording: https://zoom.us/rec/share/3-Z5A7P6xD1LWY3A-WfueZU7F4Haeaa80XcZr_UJz4r4zGY2XeS31gnPK9QG9tA?startTime=1583287601000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2/19/2020, 11pm EST | Viavi presented a range of simulators that will be valuable for OSC use case testing and validation. Slides -
Action: Discuss in OSC TOC meeting regarding Viavi | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1/7/2020, 9pm | Epics spreadsheet: RSAC_Bronze_release_planning.xlsx Traffic steering use case: RSAC_Bronze_Use Case-Traffic Steering QoE.doc Health check use case: RSAC_Bronze_HealthCheck_UseCase.docx | Recording: https://zoom.us/rec/share/_OxuJb3Z8mdOSa_xwR_UQoIzMrTmaaa8h3Ie_KUMzRvkdqfAxahEtx8_Z-VE0OmU?startTime=1578448750000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9/26/19, 9am | OSC and WG review meeting 1
| WG review meeting 1 recording | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8-1-19, 9 am | Reviewed Epics Start planning for Release B - Can we use JIRA for the planning phase in addition to the Word doc? Move Release planning cadence to once a week. Alternate between evening and day every other week. Where is the Integration and Test Environment? How do we set up the test env? Couple of possibilities. Check with Jack Murray
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7-30-19, 9 pm | Reviewed epics
| O-RAN SC Ver A SW Requirements 20190730a.docx | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6-4-19, 9 pm Eastern | Reviewed and addressed comments
| O-RAN SC Ver A SW Requirements 20190604a.docx |